USU BIOLOGY & NATURAL RESOURCES

Served as prime design lead for mechanical systems, ceiling and lighting upgrades, and associated infrastructure for the USU BNR South Wing Level 3 renovation. The HVAC design included a manifold exhaust system sized for future expansion throughout the South Wing, heat recovery infrastructure, and all associated Level 3 HVAC systems and controls.